Request offerYes, it is. The wood used by our company in houses building is dried until it reaches an 8% humidity
No, it doesn’t. Multilayered wood employed in Dorna Eco houses building neither cracks nor modifies in time.
Usually, for the external windows and doors we use multilayered carpentery with double and triple glazed window and for internal doors we use solid sawn timber.
Yes, it is. Wood is treated against fire, insects and mouldiness. For the fire treatment we use MAGMA FIRESTOP and for the mould fungus and insects we employ REZISTOL.
Because of the water based paint treatment and painting, the aspect doesn’t modify either the texture, or the colour.
Wood is coloured with translucent or dull impregnating agent, the beneficiary choosing the colour.
Thermal insulation is made of mineral wool or ecological insulator.
es, they can. There is the option for the house building to mount both external and internal insulation (0.15 W/sqm K) this way they can be used in any season. Generally, Dorna Eco houses are made for living.
Dorna eco houses have an earthquake resistance up to 10⁰ Richter.
Wooden houses have a shelf life of up to 100 years. Dorna Eco House assures a 10-year-warranty and post-warranty service if the beneficiaries have responsibly respected the normal reqiurements of house maintenance.
Depending on the project, on the surface and the constructive type delivery time may vary from 1 month to 2.5 months.
Execution projects are authorized by our company’s engineers.
The project for the Construction Authorization may be authorized by an architect employed by the beneficiary or by Dorna Eco House.
At Vatra Dornei or we can guide you to the places where we built houses if you live in another region/country. The location of houses is identified on our website too. .
For example, for a Dorna Residence150 sqm house, we need 20-30 days, if there are 4 workers. For the same surface, in the case of Dorna Masiv constructive system, the KIT wood + carpentry version, we need the same period of time, 20-30 days.