Tel: +40 230 374.175 || Tel/Fax: +40 230 375.511 || Mobile: +40 742 838.043
Prices according to the building stages

STAGE I - STRUCTURE wood, assembling
Contains:

  • Internal/External walls
  • Layered beams for the ceiling
  • Roof structure 
  • OSB

                                                                                                           120 € / mp
_______________________________________________________________________

STAGE II – wood KIT, assembling
Contains:
Stage I  + 

  • Wainscot
  • Boarded floor
  • Stairs
  • Balustrade
  • Decorative elements
  • Insulation collar beams
  • Fascia board

                                                                                                           230 € / sqm
_______________________________________________________________________

STAGE III – wood KIT, carpentry, assembly
Contains:
Stage II  + 

  • External doors (multilayered wood double glazed)
  • Interior doors (solid timber)
  • Windows (multilayered wood double glazed)

                                                                                                            280 € / mp
_______________________________________________________________________

STAGE IV – Turn key house
Contains:
Stage III  + 

  • Electrical installation
  • Thermai installation
  • Sanitary installation
  • Roof covering (tile, metal sheets, bricks)
  • Insulation materials (mineral wool, foil, polystyrene)
  • Internal ceramics
  • Internal finish (according to the nature of the surface)
  • External paint (according to the nature of the surface)

                                                            
                                                                                                            330 € / mp

_______________________________________________________________________
 
The prices are for the houses with ground floor and one upper floor
Clients can choose any stage of finish, having the possibility that some of the works should be executed by themselves or with local companies.
No stage of finish involves the fundament, which is the object of a separate estimation and it is usually realized by the recipient with a specialized local company, on the ground of a geotechnical study. 

Copyright © 2009 Dorna Eco House S.R.L.                                                                                          design by www.vatradornei.net